Skip to content
Engineer monitoring water quality at a plant

CUBIC WATER · Sectors

Treatment plants for hospitals and clinics

Hospitals · Clinics · Health centers

A hospital never closes, and neither can its treatment plant. We design systems with standby equipment and disinfection, and keep them running 365 days a year.

The real problems

What a health center demands

A hospital’s plant works under the strictest scrutiny with no room for downtime.

  • 01

    24/7 operation

    There is no time to stop the plant: any failure affects patients and staff.

  • 02

    Effluent disinfection

    Treated water must be disinfected before reaching the receiving body.

  • 03

    Cleaning and laundry chemicals

    Disinfectants and detergents that can inhibit the biological process if not considered in the design.

  • 04

    Strict health inspection

    Reports and controls that must always be up to date with the Ministry of Health.

  • 05

    Growing services

    New towers, specialties and beds that raise flows above design.

  • 06

    Critical equipment with no standby

    A single blower or pump is a single point of failure.

Costa Rican regulations

What the regulations require

Verified against the official texts of Costa Rican regulations.

  • Additional parameters

    Hospital, medical, dental and veterinary activities also analyze fecal coliforms, color, phenols and heavy metals.

  • Fecal coliforms

    Wastewater from hospitals, health facilities and microbiology labs discharged to a receiving body may not exceed 1,000 fecal coliforms per 100 mL.

  • Radioactive substances

    Discharging or infiltrating wastewater contaminated with radioactive substances is prohibited.

  • Reports up to date

    Failing to file operating reports can lead to suspension of the health operating permit.

Sources: Decreto 33601-MINAE-S, Reglamento de Vertido y Reúso de Aguas Residuales

The solution

How we solve it

Reliability by design: redundancy, disinfection and disciplined operation.

  1. 01 Redundant design Standby equipment so no failure stops treatment. Design and construction
  2. 02 Final disinfection A disinfection stage sized for the flow and required quality. Design and construction
  3. 03 Equalization Absorbs laundry, kitchen and cleaning peaks. Design and construction
  4. 04 Certified operation INA-certified operators with routines, records and parameter control. Operation
  5. 05 Preventive maintenance A scheduled plan for critical equipment to anticipate failures. Maintenance

Track record

Experience in healthcare

We designed and built the Hospital CIMA Liberia plant, and our technical director designed and directed the one at the Paraíso Cervantes Health Area.

All projects
Paraíso Cervantes Health Area (technical director’s track record)
55 m³/day

Frequently asked questions

Frequently asked questions

Can laboratory waste go to the treatment plant?

Hazardous and biomedical waste is managed separately under its own regulations. The plant treats the hospital’s wastewater, and its design accounts for the cleaning and laundry chemicals that come with it.

What happens if a piece of equipment fails?

With a redundant design, the standby unit takes over and treatment continues while the main unit is repaired.

Can you operate our hospital’s plant?

Yes. We have INA-certified operators, on shifts or outsourced, and discharge monitoring with accredited laboratories.

Get in touch

Let’s talk about your plant

Tell us what is happening: our engineers will propose the right solution.