CUBIC WATER · Sectors

Treatment plants for buildings and commercial projects

Offices · Shopping centers · Restaurants

Little space, lots of people and zero tolerance for odors. We design compact plants that fit where the project needs them and comply from day one.

The real problems

The challenges of an urban project

In the city, the plant competes for every square meter and lives alongside people all day.

  • 01

    Limited space

    Land is too valuable to devote to a large conventional plant.

  • 02

    Restaurants and food courts

    Kitchen grease and oil that overload the system if not captured first.

  • 03

    Peaks by schedule

    Offices and shops generate almost all their water in a few hours a day.

  • 04

    Permits that delay the works

    Without design report, drawings and operating manual, the building or operating permit stalls.

  • 05

    Plants in basements or plant rooms

    Enclosed spaces that require ventilation, access and safety for maintenance.

  • 06

    Operating costs

    Oversized or poorly tuned equipment that wastes energy.

Costa Rican regulations

What the regulations require

Verified against the official texts of Costa Rican regulations.

  • Discharge to the sewer

    Table 2 limits: BOD 300 mg/L, COD 750 mg/L, suspended solids 300 mg/L and fats and oils 50 mg/L.

  • Discharge to a river or stream

    Much stricter limits: BOD 50 mg/L, COD 150 mg/L, suspended solids 50 mg/L and fats and oils 30 mg/L.

  • Drawings and site permit

    The plant needs a site permit and drawings approved by the Ministry of Health before construction.

  • Restaurants and kitchens

    Fats and oils are among the most frequently exceeded parameters: a well-maintained grease trap is the first control.

Sources: Decreto 33601-MINAE-S, Reglamento de Vertido y Reúso de Aguas Residuales

The solution

How we solve it

From permit to operation, with a plant that fits into the project.

  1. 01 Custom compact plant Prefabricated systems that treat more water in less space. Design and construction
  2. 02 Below-grade installation Buried under parking or green areas, or in ventilated plant rooms. Design and construction
  3. 03 Complete permitting Design report, drawings, calculations and filing with the Ministries of Health and Environment. Permits and approvals
  4. 04 Grease control Kitchen pretreatment to protect the biological process. Design and construction
  5. 05 Operation and maintenance Certified operators and preventive maintenance that keeps costs under control. Maintenance

Track record

Design and construction in one team

CUBIC PRO designs and builds the building and CUBIC WATER its treatment system: one point of responsibility for the project.

All projects
Monte Verde shopping center (technical director’s track record)
52 m³/day
Almacenes El Rey (technical director’s track record)
12 m³/day
Minimum design flow of our plants
190 m³/mo
Certified operators
INA

Frequently asked questions

Frequently asked questions

Can a treatment plant go in a basement or under a parking lot?

Yes. Compact plants can be installed below grade or in plant rooms; in enclosed spaces, ventilation, access and safety for maintenance are designed in.

What documents does the plant need for the permit?

Design report, construction drawings, calculations and an operation and maintenance manual. CUBIC WATER prepares them and files with the Ministries of Health and Environment.

Do I need a treatment plant if there is a sewer?

It depends on whether the project can connect to a sewer network with treatment and on the utility’s conditions. If no connection is available, the project must treat its water on site.

Do you design the plant together with the building?

Yes. CUBIC PRO designs and builds the project and CUBIC WATER the treatment system, coordinated from the concept stage.