Skip to content
Compact treatment plants on site, ready to install

CUBIC WATER · Water treatment

Projects and experience

Design, construction, rehabilitation and operation

We design, build, rehabilitate and operate wastewater treatment plants for industry, hospitals, institutions and residential developments throughout Costa Rica.

Key clients

Treatment plants for demanding industries

Flagship project

Sigma Alimentos

Sigma Alajuela

Processed meats · Alajuela

460m³/day

of wastewater from processed meat production

Design and construction of the wastewater treatment plant (WWTP) expansion for Sigma Alimentos Costa Rica’s processed meat facility.

Client
Sigma Alimentos Costa Rica S.A.
Scope
Design and construction
Status
In progress · CFIA permit process
Location
Alajuela

Another project with Sigma

Monteverde

Sigma Monteverde · Dairy plant · Productores Monteverde

Physical survey and assessment of the dairy plant’s wastewater treatment plant.

  • Industrias Cárnicas Integradas

    Pescarnes Walmart · El Coyol

    Construction and technical direction of the meat plant’s wastewater and process water treatment plant.

    150 m³/day

    Design and construction →

  • Unilever

    San Antonio de Belén

    Condition assessment of the treatment system, corrective actions, maintenance and repairs to improve performance and increase production.

    Rehabilitation

    Assessment and diagnosis →Maintenance →

  • Smurfit Kappa Empaques

    Costa Rica

    Ongoing operation and maintenance program for the treatment plant of a continuous corrugated board production facility.

    Operation and maintenance

    Operation →Maintenance →

  • Holcim Costa Rica

    Cement industry

    Water quality support and control: maintenance, full cleaning and analysis of industrial water.

    Quality control

    Maintenance →

  • ICE

    Costa Rican Electricity Institute

    Rincón Grande de Pavas WWTP, in progress. Also a treatment system with septic tank and a 250 m² infiltration field at the Paraíso facility.

    119 m³ · PavasIn progress

    Design and construction →

  • Hospital CIMA Liberia

    Pacific Plaza Health & Living

    Design and construction of the wastewater treatment plant.

    165 m³/day

    Design and construction →

  • Grupo IREX

    Concepción de La Unión, Tres Ríos

    Design and construction of a constructed wetland (biojardinera) for the wastewater of the plant’s cafeteria.

    Constructed wetland

    Design and construction →

  • Fruthos del Trópico

    Pre-cut food plant

    Design and construction of a septic tank and a 300 m² infiltration field to improve the wastewater effluent.

    300 m² drainage field

    Design and construction →

Rehabilitation route

How CUBIC WATER brings a plant back to life

  1. 01 Assessment Current condition of the plant
  2. 02 Technical proposal Solutions and scope
  3. 03 Permits Permits and documents
  4. 04 Rehabilitation Civil, electromechanical and automation works
  5. 05 Start-up Tuning and verification
  6. 06 Operation Maintenance and reporting

It starts with an assessment of your plant and can end with full operation by INA-certified operators.

Complementary experience

Drinking water and disinfection

Maintenance and upgrades for water treatment plants, disinfection systems and cathodic protection of water mains.

  • Acosta water treatment plant

    AyA

    Electrical system upgrades, chlorination house, flocculator roofing, new filter covers, doors, floors and perimeter fencing; laboratory maintenance.

  • Cathodic protection, Orosi water mains

    AyA

    System maintenance and diagnostics: rectifier units, anode beds, potential measurements and performance testing.

  • Automatic disinfection system

    Acueducto de Paquera

    Supply and installation of an automatic disinfection system for the water system.

  • La Joya and Carbonal disinfection houses

    ESPH · Innovagua

    Refurbishment of the tanks’ disinfection houses.

  • El Tirol water treatment plant

    ESPH

    Technical direction of the water treatment plant in San Rafael de Heredia.

Technical director’s track record

1,820 m³/day of treatment capacity

Before founding Grupo CUBIC, Ing. Róger Cubero Cascante designed and directed wastewater treatment plants across the country (Depuragua and R&M de Centroamérica, 2007–2009).

  • 400 m³/day

    Residencial Portillo, Turrúcares

    Residential

  • 309 m³/day

    Rancho Villa Real, Tamarindo

    Residential condominium

  • 300 m³/day

    Torres de la Canela, Jacó

    High-rise condominium

  • 250 m³/day

    Urbanización Los Cartagos

    Residential

  • 100 m³/day

    Marina Pez Vela, fase 1-F

    Tourism

  • 60 m³/day

    Vista de Leona, Garabito

    Residential condominium

  • 55 m³/day

    Área de Salud Paraíso Cervantes

    Ministry of Health

  • 52 m³/day

    Centro comercial Monte Verde

    Retail

  • 12 m³/day

    Casa Roca, Tamarindo

    Ordinary wastewater

  • 12 m³/day

    Almacenes El Rey

    Retail

1,550 m³/day of combined treatment capacity in the plants designed and directed by the technical director.

Gallery

Water treatment infrastructure

  • Installation of a compact underground treatment plant
  • Compact steel treatment plant for industrial use
  • Compact underground treatment plant for a home
  • Constructed wetland for natural greywater treatment

Also see our glass-fused-to-steel tank projects and our clients and partners.

Some of our clients

More than 40 companies and institutions

Clients and partners

Get in touch

Ready to start your project?

Our technical team supports you from the initial assessment through to commissioning.