Glass-fused-to-steel san ramón, la virgen de sarapiquí tank in Sarapiquí, Heredia

Project 2021 · 300 m³ · Sarapiquí, Heredia

San Ramón, La Virgen de Sarapiquí tank

Permastore® glass-fused-to-steel tank for INDER (rural development institute) in Sarapiquí, Heredia.

About the project

300 m³ of drinking water storage

The San Ramón, La Virgen de Sarapiquí tank is a glass-fused-to-steel water storage tank by Permastore®, with 300 m³ of nominal capacity, located in Sarapiquí, Heredia. It was supplied and installed by Grupo CUBIC (2021) for INDER (rural development institute).

It is a Permastore 2820 SR-20 model, 8.54 m in diameter and 6.14 m high, with an effective volume of 305.2 m³. Its foundation — a 72.99 m² foundation slab with 23.27 m³ of concrete — was designed by Grupo CUBIC’s in-house engineering team.

Glass-fused-to-steel tanks are especially well suited to ASADAS and rural water systems: they are erected in a few weeks, never need painting and keep drinking water safe for decades with minimal maintenance.

Learn more about glass-fused-to-steel tanks , our turnkey process and the tank maintenance service.

What changes for the community

  • Strengthens the water system of San Ramón de La Virgen and neighboring communities
  • About 2,500 people supplied
  • Drinking water for the area’s new businesses

Voices from the community

  • «This tank strengthens the water system we run for the San Ramón community, where we supply about 2,500 people.»
    San Ramón de La Virgen ASADA
  • «We are proud to present this tank, built by CUBIC, and we are very grateful. I hope the town is proud to have a tank with this technology.»
    ASADA board
  • «We will have drinking water for many years, for our grandchildren and for every generation.»
    San Ramón community
  • «We are a small community, but a big one in development. We hope this is not the first project, but one of many more.»
    Water service user

Translated from the Spanish testimonies in the handover video.

Project video

Turnkey scope delivered

  • 104.10 m of chain-link fencing and 62 m² of sidewalk
  • Pilot-operated float level-control valve
  • 766 m² of base
  • 4 valve chambers